How to run Maintenance on Vertical Screen Screw Compactor

How to run Maintenance on Vertical Screen Screw Compactor

1. Cleaning Brushes Replacement
  1. Dismount the screen unscrewing fixing bolts
  2. Unscrew the bolts A fixing the brushes to the spiral.
  3. Fix new brushes to the spiral with new bolts
  4. Reassembly the screen
Call 1-877-DRY-CAKE or email info@drycake.com to order brushes for your screen.

2. Screen Basket Replacement
  1. Unscrew the fixing bolts of the screen basket to the cone.
  2. Apply the new screen basket and fix it to the cone.

3. Replacement of the Liner (Strips) In the Tube and/or Cone
  1. Unscrew the bolts “A” fixing the screen basket and removing it (see before).

  2. Unscrew bolts “B” from the drive flange.

  3. Remove the spiral from the pipe.

  4. Remove the bolts fixing the liner to the tube put on the external side of the tube.

  5. Remove the plates (liner).

  6. Make the same operations on the reverse, replacing the special seal with a new one, to obtain a perfect seal.


4. Gearmotor Replacement
  1. Dismount the protection

  2. Unscrew bolt Fixing the motor shaft

  3. Unscrew bolts B fixing the gear motor to the screen screw frame.

  4. Put the new gear motor following the previous operation on the opposite.





    • Related Articles

    • How to run routine Maintenance on DSS-T in Tank Screen Screw

      1. BRUSHES REPLACEMENT Disconnect the Main Power Supply Make sure the machine cannot start itself for any reason. Disconnect the motor wires and all the hydraulic connections. Open all the cover and clean with plenty of water. Unscrew the bolts of ...
    • How is the Perfobask Vertical Screen inlet designed

      DSS-V Inlet Design We have direct inlet with overflow pipe on the inlet pipe. The headloss is a function of the depth of the screen. The foot of the screen is designed to prevent submersion of the screening basket, with the bottom of the screening ...
    • How to Perform Unidrum Maintenance

      PERIODICAL CHECKS END OF EACH WORKING SESSION - Check that there is no leakage of oil from the gearbox and there are no drip - Check the integrity of security systems and protection WEEKLY - Check if the outlet is free from residues of material, if ...
    • How to install DSS Vertical Railway

      keeping hooked the screen, match the inlet with the invert pipe [1] and check the level: B. once the levels are ok, put on the collar bracket [2] C. now the screen is fixed and you can move forward with the installation of the railways: wheels [3] ...
    • How to Adjust Supports on a Screen or Grit unit

      If you find you have interference between the outlet of a screen and the support of the screen. The support of the screen bolted to the transport zone of the screen and is both adjustable in height and position as it is bolted throat of the ...